Tłı̨chǫ Engineering and Environmental Services Ltd. (TEES) was contracted to complete the deconstruction of the temporary storage areas in Fort Smith (NWT) and Fort Fitzgerald.
The work included the safe excavation and segregation of Naturally Occurring Radioactive Material (NORM) that had been placed in the lined storage areas after the initial clean-up of the Northern Transportation Route. The NORM was loaded into trucks and taken to either the Secure Energy Services NORM Class on or the Non-hazardous Class 2 landfill facility. Once the temporary storage areas were deconstructed, the areas were remediated.